When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
More window sticker trivia about the date at the very bottom outside the green boxes.
Originally said 8/26/21 which was the date it was sent to plant. The date inside the green boxes remained constant at 8/26/21
Changed to 9/2/21, likely the day it started down the line, production date was 9/4/21
Changed to 9/10/21, today, which is the day the truck arrived at "Ramp One", the end of it's rail transport journey.
You know there's a real sticker in the truck and none of those dates have changed, right?
More window sticker trivia about the date at the very bottom outside the green boxes.
Originally said 8/26/21 which was the date it was sent to plant. The date inside the green boxes remained constant at 8/26/21
Changed to 9/2/21, likely the day it started down the line, production date was 9/4/21
Changed to 9/10/21, today, which is the day the truck arrived at "Ramp One", the end of it's rail transport journey.
You know there's a real sticker in the truck and none of those dates have changed, right?
I'd love to be able to correlate the bottom date with something, but I don't think that is the case.
I believe that the date on the bottom is the version date of the WS. They are updated once a week, and by looking at that date you can tell if you have the latest WS if the date is within the last 7 days.
I'd love to be able to correlate the bottom date with something, but I don't think that is the case.
I believe that the date on the bottom is the version date of the WS. They are updated once a week, and by looking at that date you can tell if you have the latest WS if the date is within the last 7 days.
I wish we did know what this date meant...
8/12: I received email from Ford that my truck was booked to build week of 9/6.
8/27: I got confirmation from CybermanD that my build to day was 9/7.
9/1: My window sticker pulled up. Date in the "Special" box was 8/31/21. Date at bottom of page was 9/1.
9/8: I found out from CybermanD my build to day was pushed to 9/9.
9/8: The date on the bottom of window sticker changed from 9/1 to 9/8.
9/10: The date on the bottom of window sticker changed from 9/8 to 9/10.
I still don't have any confirmation that was my truck was built yesterday. I called my dealer today and he said the system just shows a build to day of 9/9. I see that the spreadsheet has already updated and there have been a few folks build date populate as 9/9, however, mine hasn't... I'm hoping that since there are only 2 shift working, maybe mine started yesterday and will finish up this evening...
But, the date on the bottom of the window sticker changed from 9/8 to 9/10 within the last 2 hours... so I am hoping that this means things are moving with mine, and hopefully I'll get my "It's built!" email later tonight or tomorrow...
Edit:... so now when I pull up my sticker the date on the bottom is back to 9/8... I don't know what's going on...
Designated 10/25 Adaptive Steering week and made that red..
At least 2 of us poor souls have been relegated to 10/25 because of our past sins, even if we have since relented and removed our desire to have such frivolous things, such as Adaptive Steering.
I wish there was a way to flag Ford about an order submitted long, long ago, that remains in 2022 purgatory, having completed our time ordered, and for which we have requested forgiveness!
I have a question for anyone that would know. My truck went into production on 9-2 and haven't got any updates about it. I'm getting spray in bedliner, mud flaps, hood defector and bed step installed. How long does it take to get all this done once it's in production. Thanks
I have a question for anyone that would know. My truck went into production on 9-2 and haven't got any updates about it. I'm getting spray in bedliner, mud flaps, hood defector and bed step installed. How long does it take to get all this done once it's in production. Thanks
It should not be much longer. Your truck was built on 9/2, as you mentioned so it is undoubtedly getting those options added now. When you have several like that, it's bound to take longer.
You can look on the delivery tab of the spreadsheet and see how much time each truck spent between production and release. Maybe find a couple of trucks with options like yours.
hopefully I'll get my "It's built!" email later tonight or tomorrow...
Yeah, per my dealer my build was 9/9 and I haven't seen anything either. This is actually my third special ordered vehicle from Ford (first one a Fusion, and then now two F350s) and I get more anxious with each one. Although, I knew I would eventually replace both the Fusion and my current F350. The new F350 is planned to be the last new vehicle we buy for me.
Yeah, per my dealer my build was 9/9 and I haven't seen anything either. This is actually my third special ordered vehicle from Ford (first one a Fusion, and then now two F350s) and I get more anxious with each one. Although, I knew I would eventually replace both the Fusion and my current F350. The new F350 is planned to be the last new vehicle we buy for me.
My 2022 F-350 made it to the dealer yesterday six days ahead of the earliest delivery date. I went to look at it today and the paint did not have any of the orange peel look I have read about on here. The truck has not gone through dealer prep yet. I hope to pick it up by middle of next week. The rapid red paint looks great.
My order went from Scheduled (Week of 27 September) back to Order Confirmed? F350 DRW Lariat and no adaptive steering.
That's correct. Your next step will be "In Production" Should take place a few days prior to build date. Your window sticker should also become available around that time.
This Hennessey Takes the Expedition Tremor's Off-Roading Capability to the Next Level
Slideshow: The VelociRaptor Expedition gains a lift, upgraded suspension, Brembo brakes, and trail-ready equipment while retaining the stock 440-horsepower EcoBoost V6.
Rezvani's Latest Post-Apocalyptic Monster Is a Ford F-150 Raptor Underneath
Slideshow: Called the Fortress, the 850-horsepower pickup combines Raptor underpinnings with military-inspired features, survival equipment, and a starting price of $285,000.