Notices
1999 - 2003 7.3L Power Stroke Diesel  
Sponsored by:
Sponsored by: DP Tuner

Difference with long lead injector??

Thread Tools
 
Search this Thread
 
Old Aug 28, 2007 | 11:48 PM
  #1  
Mr. Bob's Avatar
Mr. Bob
Thread Starter
|
Elder User
Joined: Sep 2005
Posts: 641
Likes: 1
From: Delta B.C.
Difference with long lead injector??

Hey Guys...

Trying to figure all this out.

I understand that they ran a long lead injector in the #8 cylinder to deal with some of the issues of the dead headed fuel system.

What exactly is the difference with the long lead injector? When did they run these?

I notice that alot of the regualted return systems say to
eliminate the long lead injector, is there a way to change it or does this require the replacement of the entire injector??

I ask because I am still very much considering the DIY injectors and dont understad this.

Thanks guys!!!!!!
Bob
 
Reply
Old Aug 29, 2007 | 12:43 AM
  #2  
Mr. Bob's Avatar
Mr. Bob
Thread Starter
|
Elder User
Joined: Sep 2005
Posts: 641
Likes: 1
From: Delta B.C.
Hmmmm... I may have answered my own question...

the long lead injector has a longer primary shot of fuel to help with the under fueling condition....

so rebuilding my injectors will take care of this....
 
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
FarmallM4
Pre-Power Stroke Diesel (7.3L IDI & 6.9L)
1
May 2, 2016 04:17 PM
schlepprock250
1999 - 2003 7.3L Power Stroke Diesel
5
Jan 17, 2013 08:56 PM
MikeSDK
1999 - 2003 7.3L Power Stroke Diesel
11
May 16, 2012 09:44 AM
UNTAMND
1999 - 2003 7.3L Power Stroke Diesel
4
May 6, 2010 09:13 PM
DAI532
1999 - 2003 7.3L Power Stroke Diesel
4
Sep 1, 2009 10:36 AM




All times are GMT -5. The time now is 10:35 AM.

story-0
This Hennessey Takes the Expedition Tremor's Off-Roading Capability to the Next Level

Slideshow: The VelociRaptor Expedition gains a lift, upgraded suspension, Brembo brakes, and trail-ready equipment while retaining the stock 440-horsepower EcoBoost V6.

By Verdad Gallardo | 2026-06-12 11:01:55


VIEW MORE
story-1
Top 10 Fords at 2026 Carlisle Ford Nationals

Slideshow: Top 10 Fords at 2026 Ford Nationals

By Joe Kucinski | 2026-06-09 11:10:08


VIEW MORE
story-2
3 Best / 3 Worst Parts of Modern Ford Ownership

Based on years of owning multiple modern Ford products.

By Brett Foote | 2026-06-09 10:53:36


VIEW MORE
story-3
10 Amazing Upgrades That Solve Common Ford Truck Owner Headaches

SPONSORED: From muddy boots to rain-soaked cargo, these upgrades address some of the most common frustrations Ford truck owners face every day.

By Pouria Savadkouei | 2026-06-08 18:50:34


VIEW MORE
story-4
Every 2026 Ford Engine Explained

Here's everything you need to know about every Ford engine available for the 2026 model year.

By Brett Foote | 2026-06-05 12:58:01


VIEW MORE
story-5
10 Ugly Ford Trucks That We Still Kinda Love

Slideshow: 10 ugly Ford trucks that we still kinda love.

By Joe Kucinski | 2026-06-03 09:51:16


VIEW MORE
story-6
10 Things Every Truck Owner NEEDS (2026 Edition)

Slideshow: the best gifts for dads & grads

By Michael S. Palmer | 2026-06-03 15:43:58


VIEW MORE
story-7
Rezvani's Latest Post-Apocalyptic Monster Is a Ford F-150 Raptor Underneath

Slideshow: Called the Fortress, the 850-horsepower pickup combines Raptor underpinnings with military-inspired features, survival equipment, and a starting price of $285,000.

By Verdad Gallardo | 2026-06-03 11:38:36


VIEW MORE
story-8
Top 10 Most Expensive Ford Trucks Ever Sold on Bring a Trailer

Slideshow: 10 most expensive Ford trucks ever sold on Bring a Trailer.

By Joe Kucinski | 2026-05-27 16:24:34


VIEW MORE
story-9
2027 Ford Super Duty Buyer's Guide (Every Model, Engine, & Package)

Here's everything that has changed for the latest model year.

By Brett Foote | 2026-05-27 16:17:28


VIEW MORE