Any contractors out there? -Partition wall question.

I'm needing to put up a partition wall in my basement. The problem is that the steel I beam and ductwork runs right across where I need to put the wall. My wall will be perpindicular to the ducts. The problem is that there will be a span of wall that is about 6 feet long that won't be attached to the ceiling joists. Obviously it's not load bearing, so I'm not worrying about the strength, I just don't want the wall to have any give when it gets bumped into. Anyone have any suggestions?

Thanks in advance.

Matt
 
  #2  
Old 09-29-2004, 05:33 PM
pchristman's Avatar
pchristman
pchristman is offline
Laughing Gas
Join Date: Dec 2003
Location: KCMO
Posts: 796
Likes: 0
Received 0 Likes on 0 Posts
Which way do the joists run? Do they sit on top of the I-beam? A few more details will make it easier to answer.
 
  #3  
Old 09-29-2004, 06:23 PM
maa139's Avatar
maa139
maa139 is offline
Posting Guru
Thread Starter
Join Date: Apr 2003
Location: West Chester PA
Posts: 1,085
Likes: 0
Received 0 Likes on 0 Posts
Yes, the ends of the joists sit on the I beam, and the ductwork runs parallel to the I beam. The ductwork is nailed to the bottom of the joists, so it is hanging down about a foot from the joists.

Thanks.
 
  #4  
Old 09-29-2004, 07:18 PM
pchristman's Avatar
pchristman
pchristman is offline
Laughing Gas
Join Date: Dec 2003
Location: KCMO
Posts: 796
Likes: 0
Received 0 Likes on 0 Posts
I think I see it now. The 6 ft you're talking about is the part beneath the ductwork.

Put in a header between the studs on either side of the ductwork, and run your studs up to it, just as you run the rest of the studs to the top header (which, if I'm picturing this right, will be running parallel to the joists and parallel to the I-beam. Will the header be attached to the bottom of a joist, or to nailers between the joists?
 
  #5  
Old 09-29-2004, 07:43 PM
maa139's Avatar
maa139
maa139 is offline
Posting Guru
Thread Starter
Join Date: Apr 2003
Location: West Chester PA
Posts: 1,085
Likes: 0
Received 0 Likes on 0 Posts
Exactly. The 6 feet is below the ductwork. The new wall will be attached to nailers between the joists.
 
  #6  
Old 09-29-2004, 07:56 PM
pchristman's Avatar
pchristman
pchristman is offline
Laughing Gas
Join Date: Dec 2003
Location: KCMO
Posts: 796
Likes: 0
Received 0 Likes on 0 Posts
Lots of people put in nailers flat, 'cause it's easy and somehow seems right. It will be a lot easier to nail a header to a vertical nailer, though, and the wall (as well as the floor above) will be firmer.

If you're screwing on the header, it will be just as easy either way, but vertical nailers will still result in firmer construction.
 
  #7  
Old 09-29-2004, 09:07 PM
maa139's Avatar
maa139
maa139 is offline
Posting Guru
Thread Starter
Join Date: Apr 2003
Location: West Chester PA
Posts: 1,085
Likes: 0
Received 0 Likes on 0 Posts
Pchristman - thanks for the advice!
 
  #8  
Old 09-29-2004, 09:19 PM
DaveAK's Avatar
DaveAK
DaveAK is offline
Senior User
Join Date: Jan 2004
Location: Sterling, Alaska
Posts: 118
Likes: 0
Received 0 Likes on 0 Posts
I think that it will be OK to have a six foot notch in your wall. Is there any way that you could bolt something to that I beam for support?
 
  #9  
Old 09-29-2004, 10:11 PM
f250rangerexplorer's Avatar
f250rangerexplorer
f250rangerexplorer is offline
Posting Guru
Join Date: Aug 2004
Location: Yuba City, Ca
Posts: 1,138
Likes: 0
Received 0 Likes on 0 Posts
first off i know i'm gonna get crap but my g-pa owns a construction company here(brag brag brag, lol) but bolt it to the concrete floor. that'll give you a lot of strength. use 2x4's and figure where you want your wall to be and then drill into the 2x4 until you hit concrete then go about a 1/4" to mark the holes. the put in the fasteners and bolt it down. use simpson strong ties if you want strength for the top. don't toenail anything. it makes it weak. i'll do it for you for a measly $250 and supplies and hotel and flight and car rental. lol. j/k. anyways hope this helps. i think i know what your doing. Good luck!!!!!




Drive It Like You Stole It!!!
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
ford2go
General NON-Automotive Conversation
7
08-29-2013 06:38 AM
smokewagun
General NON-Automotive Conversation
13
02-05-2012 10:18 PM
websthes
General NON-Automotive Conversation
10
11-08-2007 09:20 PM
fred_79f250
General NON-Automotive Conversation
7
08-26-2007 09:29 PM
maa139
General NON-Automotive Conversation
37
10-13-2004 12:54 AM



Quick Reply: Any contractors out there? -Partition wall question.



All times are GMT -5. The time now is 04:18 AM.