Notices
1999 - 2003 7.3L Power Stroke Diesel  
Sponsored by:
Sponsored by: DP Tuner

long lead injector?

Thread Tools
 
Search this Thread
 
Old Dec 11, 2005 | 07:09 PM
  #1  
PSNut's Avatar
PSNut
Thread Starter
|
Postmaster
Joined: Jun 2005
Posts: 3,438
Likes: 0
From: New Hampshire
long lead injector?

was reading info on external regulated bypass systems and was wondering what a long lead injector is? Used in the #8 position.
 
Reply
Old Dec 11, 2005 | 08:59 PM
  #2  
kilapapipa's Avatar
kilapapipa
Senior User
Joined: Nov 2004
Posts: 282
Likes: 0
From: Central Wyoming
Some trucks have the LL8 and some don't. I think they put it the late 2000 builds and up from what I have read. They put it in the #8 pos. to hold more fuel and pressure as the #7 fires right before #8 and starvs #8. If you put the Regulated Return system in and you have an LL8, you are suppose to take it out.You can remove the valve cover to see if you have one.
 
Reply
Old Dec 12, 2005 | 04:43 AM
  #3  
PSNut's Avatar
PSNut
Thread Starter
|
Postmaster
Joined: Jun 2005
Posts: 3,438
Likes: 0
From: New Hampshire
Originally Posted by kilapapipa
Some trucks have the LL8 and some don't. I think they put it the late 2000 builds and up from what I have read. They put it in the #8 pos. to hold more fuel and pressure as the #7 fires right before #8 and starvs #8. If you put the Regulated Return system in and you have an LL8, you are suppose to take it out.You can remove the valve cover to see if you have one.
Interesting...thanks!
 
Reply
Old Dec 12, 2005 | 10:39 AM
  #4  
Fat Diesel's Avatar
Fat Diesel
Logistics Pro
20 Year Member
Liked
Loved
Community Favorite
Joined: Aug 2005
Posts: 3,886
Likes: 180
From: Morgan Hill, CA
Club FTE Silver Member

I've got the ITP system and one thing to keep in mind is the fuel temps in the summer. There haven't been any known problems, but your fuel tank will get up to 160 degrees in the hot summer. The regulated return systems run fuel through the heads and back into the tank. Make sure you get a Dahl filter too. I really like my system and the pressure is easily adjustable with an allen wrench. If you do have the long lead injector in #8, I would replace it with a new Alliant injector and not a reman from Ford.
 
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
enduringexplorer
1999 - 2003 7.3L Power Stroke Diesel
9
Mar 6, 2021 10:08 PM
DesertZuki
1980 - 1986 Bullnose F100, F150 & Larger F-Series Trucks
12
Dec 21, 2015 10:59 PM
MikeSDK
1999 - 2003 7.3L Power Stroke Diesel
11
May 16, 2012 09:44 AM
dyhrdford
1999 - 2003 7.3L Power Stroke Diesel
12
Jan 20, 2011 02:51 AM
UNTAMND
1999 - 2003 7.3L Power Stroke Diesel
4
May 6, 2010 09:13 PM




All times are GMT -5. The time now is 10:49 AM.

story-0
This Hennessey Takes the Expedition Tremor's Off-Roading Capability to the Next Level

Slideshow: The VelociRaptor Expedition gains a lift, upgraded suspension, Brembo brakes, and trail-ready equipment while retaining the stock 440-horsepower EcoBoost V6.

By Verdad Gallardo | 2026-06-12 11:01:55


VIEW MORE
story-1
Top 10 Fords at 2026 Carlisle Ford Nationals

Slideshow: Top 10 Fords at 2026 Ford Nationals

By Joe Kucinski | 2026-06-09 11:10:08


VIEW MORE
story-2
3 Best / 3 Worst Parts of Modern Ford Ownership

Based on years of owning multiple modern Ford products.

By Brett Foote | 2026-06-09 10:53:36


VIEW MORE
story-3
10 Amazing Upgrades That Solve Common Ford Truck Owner Headaches

SPONSORED: From muddy boots to rain-soaked cargo, these upgrades address some of the most common frustrations Ford truck owners face every day.

By Pouria Savadkouei | 2026-06-08 18:50:34


VIEW MORE
story-4
Every 2026 Ford Engine Explained

Here's everything you need to know about every Ford engine available for the 2026 model year.

By Brett Foote | 2026-06-05 12:58:01


VIEW MORE
story-5
10 Ugly Ford Trucks That We Still Kinda Love

Slideshow: 10 ugly Ford trucks that we still kinda love.

By Joe Kucinski | 2026-06-03 09:51:16


VIEW MORE
story-6
10 Things Every Truck Owner NEEDS (2026 Edition)

Slideshow: the best gifts for dads & grads

By Michael S. Palmer | 2026-06-03 15:43:58


VIEW MORE
story-7
Rezvani's Latest Post-Apocalyptic Monster Is a Ford F-150 Raptor Underneath

Slideshow: Called the Fortress, the 850-horsepower pickup combines Raptor underpinnings with military-inspired features, survival equipment, and a starting price of $285,000.

By Verdad Gallardo | 2026-06-03 11:38:36


VIEW MORE
story-8
Top 10 Most Expensive Ford Trucks Ever Sold on Bring a Trailer

Slideshow: 10 most expensive Ford trucks ever sold on Bring a Trailer.

By Joe Kucinski | 2026-05-27 16:24:34


VIEW MORE
story-9
2027 Ford Super Duty Buyer's Guide (Every Model, Engine, & Package)

Here's everything that has changed for the latest model year.

By Brett Foote | 2026-05-27 16:17:28


VIEW MORE