When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
So I rolled into my local dealer and ordered up a new truck. On the order sheet, I am seeing Job#2 under the gear ratio I selected as an option. I assume this means the entire truck is also Job#2.
When we were finishing up, I asked the salesman about how long he expected the truck to take, which his answer was 10-12 weeks. So... does this mean I am waiting even longer for Job#2 because of my gear selection?
10-12 weeks is the normal response time when ordering. Details of Job 2 listed below.
JOB 2 ORDER GUIDE UPDATES – Effective on all
vehicles built on or after Job #2 (01/09/12 – Subject to
change)
• Changes to clarify Power Sliding Window, 1-touch down
window and 10,000 GVWR/9,900 GVWR Package
• Tuxedo Black (UH) exterior paint
• Green Gem (W6) exterior paint
• Removed "Late Availability" for Navigation and Lariat
Ultimate Pkg.