Pics or it didn't happen!
Join Date: Mar 2005
Location: Marlboro Mental Hospital.
Posts: 61,233
Received 3,258 Likes
on
2,268 Posts
Join Date: Mar 2009
Location: North Bay Ont Canada
Posts: 161,184
Received 5,339 Likes
on
1,726 Posts
Two Summers worth of work and we are almost done with the new cattle feed lot!
The work was done by Dad and I but we did have some help from my brothers while pouring the concrete... I think it was 13/14 truckloads or 130/140 yards of cement and two 35" trailer loads fencing material.
The pictures make it look smaller than it is but will hold another 250 head at max capacity with the feed bunks all on concrete with a big dirt lot for them to spread out and roam.
The work was done by Dad and I but we did have some help from my brothers while pouring the concrete... I think it was 13/14 truckloads or 130/140 yards of cement and two 35" trailer loads fencing material.
The pictures make it look smaller than it is but will hold another 250 head at max capacity with the feed bunks all on concrete with a big dirt lot for them to spread out and roam.
He used to love the water, but now he's too old and just sinks!
Join Date: Mar 2009
Location: North Bay Ont Canada
Posts: 161,184
Received 5,339 Likes
on
1,726 Posts
Or I can say, "go get the squirrel!" and he slides right on out.