When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
Pat, Poor contractor construction practices coupled with know knowledge about drainage led to rot! So both of those problems have been fixed on the front side of the house. Still have to do to back half this fall. It is not as bad but still going to be a job because it includes the bedroom, utility room and bathroom with the entire plumbing! But I will get it later this year.
Have a great Ta Ta Taco Tuesday Bud, Pat, Jason and our wayward Joe and Dave!
Thanks Pat.
I am happy with the outcome but I wish I could have saved and reused the real hardwood floor. I had been damp and warped so I went the snap together flooring.
Rezvani's Latest Post-Apocalyptic Monster Is a Ford F-150 Raptor Underneath
Slideshow: Called the Fortress, the 850-horsepower pickup combines Raptor underpinnings with military-inspired features, survival equipment, and a starting price of $285,000.