Well, I ordered a 2018 F250 on 9/15; hoping to get in line early and get one of the first F250's off of the line. COTUS just posted my expected delivery date as 2/14/18 . . . . 5 MONTHs after ordering. I am sorely disappointed.
No, I didn't. Lariat, Supercab, gasser with 4.30's. Nothing out of the ordinary. Maybe there is a limited supply of something I ordered; like Adaptive Steering or BLISS.
When was the first update you got from COTUS? Any chance your dealer didn't order the truck back in September? I was disappointed to order on 11/14 and get a 2/14 delivery date. I know you are disappointed. Seems like either ford or you dealer could give you an explanation.
Well, I ordered a 2018 F250 on 9/15; hoping to get in line early and get one of the first F250's off of the line. COTUS just posted my expected delivery date as 2/14/18 . . . . 5 MONTHs after ordering. I am sorely disappointed.
What priority number did your dealer assign you? Up to a point the dealers influence what priority trucks get built...If they other customers that they ranked higher, then when the plant looks at what to build they first look at what the dealer has specified...
Well, I ordered a 2018 F250 on 9/15; hoping to get in line early and get one of the first F250's off of the line. COTUS just posted my expected delivery date as 2/14/18 . . . . 5 MONTHs after ordering. I am sorely disappointed.
What is your priority code? You say nothing out of the ordinary but over 60% are crew cab and almost 70% are diesel so combine those together and a gas supercab is just not built nearly as frequently. Add that to a possible low priority and dealer alocation and I could understand a longer wait. Now 5 months, that is a little rough.
I think dealer allocation has more to do with the timing next to material availability. I ordered an ‘18 KR CCSB 6.2 with a 19 priority code (which is the worst code for a retail order) on 11/09, scheduled 11/30 for a 12/19 build date.
I think dealer allocation has more to do with the timing next to material availability. I ordered an ‘18 KR CCSB 6.2 with a 19 priority code (which is the worst code for a retail order) on 11/09, scheduled 11/30 for a 12/19 build date.
CCSB is the most produced version so even with a worse priority, it wouldn't hurt you that much.
COTUS has my ordered on date of 8-25-17 and an estimated delivery date of 2-3-18. Fully loaded KR priority code was 12. Very small norcal dealer. It is what it is.
My order date was 10/27 with no vin or estimated delivery. Large dealer (holiday ford) with a priority code of 10. Haven't an idea in hell when I might get my truck
Well, I ordered a 2018 F250 on 9/15; hoping to get in line early and get one of the first F250's off of the line. COTUS just posted my expected delivery date as 2/14/18 . . . . 5 MONTHs after ordering. I am sorely disappointed.
All things happen for a reason so just be a little more patient.
This Hennessey Takes the Expedition Tremor's Off-Roading Capability to the Next Level
Slideshow: The VelociRaptor Expedition gains a lift, upgraded suspension, Brembo brakes, and trail-ready equipment while retaining the stock 440-horsepower EcoBoost V6.
Rezvani's Latest Post-Apocalyptic Monster Is a Ford F-150 Raptor Underneath
Slideshow: Called the Fortress, the 850-horsepower pickup combines Raptor underpinnings with military-inspired features, survival equipment, and a starting price of $285,000.