Well if it's 24" pipe, that'll flow some serious gas. The Hinton/Edson/Jasper area are no longer my problem, so I haven't been keeping up with it.
Two possibilities. 1) bringing gas from NEBC to fill the half used gas plants in Central Alberta, or 2) shipping processed gas out to Kitimat for the LNG terminal that was proposed. I know there were projects of both types on the drawing boards a year or two ago, but I never heard that they were going ahead. I would have thought either project would go further north though, closer to tumbler ridge.