  #46  
Old 06-20-2013, 11:59 AM
bpounds's Avatar
bpounds
bpounds is offline
Hotshot
Join Date: Aug 2006
Location: Whittier, CA
Posts: 17,016
Received 52 Likes on 41 Posts
Steve, how do you form those sloping sides? Is the mix so dry that you can just pile it up like that and trowel it off? I've never seen this done before.
 
  #47  
Old 06-20-2013, 12:07 PM
wpnaes's Avatar
wpnaes
wpnaes is offline
FTE Chapter Leader

Join Date: Nov 2010
Location: N. IL
Posts: 30,011
Received 931 Likes on 679 Posts
Mas preguntas

Also, is that a crawl space under the house?
 
  #48  
Old 06-20-2013, 12:09 PM
SteveBricks's Avatar
SteveBricks
SteveBricks is offline
FTE Legend
Thread Starter
Join Date: Aug 2007
Location: Lakewood, Ca.
Posts: 42,085
Likes: 0
Received 2 Likes on 2 Posts
We pumped it really stiff, so it was easy to stack it up. Had the guys who did the ground work left us with a level pad all of that wouldn't have been necessary.


And yes, that's the crawl space. Plenty of room.
 
  #49  
Old 06-20-2013, 12:35 PM
bpounds's Avatar
bpounds
bpounds is offline
Hotshot
Join Date: Aug 2006
Location: Whittier, CA
Posts: 17,016
Received 52 Likes on 41 Posts
Should drain/runoff nicely.
 
  #50  
Old 06-20-2013, 06:34 PM
Maxium4x4's Avatar
Maxium4x4
Maxium4x4 is offline
Super Moderator
Join Date: Jul 2004
Location: Ohio
Posts: 20,522
Received 3,392 Likes on 2,089 Posts
If the damn thing moves, I would consider panicking .....
 
  #51  
Old 06-21-2013, 02:19 AM
OldBlackCat's Avatar
OldBlackCat
OldBlackCat is offline
Fleet Mechanic
Join Date: Mar 2006
Location: Severance, CO
Posts: 1,482
Received 47 Likes on 17 Posts
looking good!
 
  #52  
Old 07-24-2013, 08:33 AM
SteveBricks's Avatar
SteveBricks
SteveBricks is offline
FTE Legend
Thread Starter
Join Date: Aug 2007
Location: Lakewood, Ca.
Posts: 42,085
Likes: 0
Received 2 Likes on 2 Posts
Haven't had anything to add, we've been stalled on this for a couple of weeks waiting on engineering changes. Going back up tomorrow to work on getting the garage foundation inspected and poured. I'll get more pics when that's done.
 
  #53  
Old 07-24-2013, 10:16 AM
SpringerPop's Avatar
SpringerPop
SpringerPop is offline
Hotshot

Join Date: Jan 2002
Location: La La Land
Posts: 17,986
Received 188 Likes on 112 Posts
If garage is 960 sq ft, how many "cars" is that?

Pop
 
  #54  
Old 07-24-2013, 10:27 AM
SteveBricks's Avatar
SteveBricks
SteveBricks is offline
FTE Legend
Thread Starter
Join Date: Aug 2007
Location: Lakewood, Ca.
Posts: 42,085
Likes: 0
Received 2 Likes on 2 Posts
40' wide by 24' deep. One 16' door and one 8' door, so it'll hold 3.
 
  #55  
Old 07-24-2013, 01:03 PM
BradyCouchman's Avatar
BradyCouchman
BradyCouchman is offline
Post Fiend
Join Date: Sep 2007
Location: Cow Town, CA
Posts: 6,221
Likes: 0
Received 6 Likes on 5 Posts
Originally Posted by SteveBricks
40' wide by 24' deep. One 16' door and one 8' door, so it'll hold 3.
wow thats a BIG 3 car garage..... i would love to have a 24' deep garage it would mean my truck would fit inside.

and 40 feet wide there must be a shop in there too then, the doors would only take up a most 30', 2 feet on each side and 2 feet between them.
 
  #56  
Old 07-24-2013, 01:32 PM
SteveBricks's Avatar
SteveBricks
SteveBricks is offline
FTE Legend
Thread Starter
Join Date: Aug 2007
Location: Lakewood, Ca.
Posts: 42,085
Likes: 0
Received 2 Likes on 2 Posts
There's a small shop area, a bathroom, and also space for the solar storage batteries.
 
  #57  
Old 08-07-2013, 10:59 AM
SteveBricks's Avatar
SteveBricks
SteveBricks is offline
FTE Legend
Thread Starter
Join Date: Aug 2007
Location: Lakewood, Ca.
Posts: 42,085
Likes: 0
Received 2 Likes on 2 Posts
Had some design changes that held up progress, but we're finally making some headway again.

Got the garage foundation going, gonna pour the slab next week after the plumber gets in there and the gravel fill gets delivered:






The embedded plates are what the containers will be welded to. 1/2" thick with 4 14" j-bolts welded to them:




Got the house foundation finished. We grouted all of the pilasters with the boom pump on the same pour as the garage foundation. The stem wall grout was done with a line pump. Here's a few before/afters:





The plates in the next couple of pics have bolts for a ledger that will support the wooden deck next to the house:



Sleeping quarters in the background




 

Last edited by SteveBricks; 08-07-2013 at 11:14 AM.
  #58  
Old 08-07-2013, 11:24 AM
SpringerPop's Avatar
SpringerPop
SpringerPop is offline
Hotshot

Join Date: Jan 2002
Location: La La Land
Posts: 17,986
Received 188 Likes on 112 Posts
Steve,

Why the two different types of construction, i,e. grouted block versus poured concrete stem walls?

How many yards so far?

Is there a design criterion for the winds this must withstand? It appears to be able to take a direct F-5'er or a nuclear blast at five miles?

What is the governmental authority (authorities ) on this job?

Pop
 
  #59  
Old 08-07-2013, 11:55 AM
SteveBricks's Avatar
SteveBricks
SteveBricks is offline
FTE Legend
Thread Starter
Join Date: Aug 2007
Location: Lakewood, Ca.
Posts: 42,085
Likes: 0
Received 2 Likes on 2 Posts
That was another 40yds in the garage footing. And that's finished slab height.

The deal with the garage is what held us up. The plan showed a simple 12" deep x 20" wide footing and a slab-on-grade floor. Well, considering that there's an 18" frost line to deal with, you can see how this wasn't going to work. Combine that with a difference in grade height of 6 or 8 inches from side to side along with a requirement that the floor be 8" above finish grade and all of a sudden you've got a footing that's damned near 4 feet high from it's base to the bottom of the slab. Obviously, 2 horizontal bars top and bottom isn't going to cut it in that application, so we had a detail re-drawn that added some vertical reinforcement as well as changing the method of attachment for the containers. I won't even go into the way that was drawn

As far as government authorities, all of the building inspection in Mono County's thing. The process of actually getting approval for the project involved just about any agency you could name, from the Lahontan Regional Water Quality Control Board and the State Department Of Fish And Game to the Army Corps Of Engineers.
 
  #60  
Old 08-07-2013, 06:02 PM
OldBlackCat's Avatar
OldBlackCat
OldBlackCat is offline
Fleet Mechanic
Join Date: Mar 2006
Location: Severance, CO
Posts: 1,482
Received 47 Likes on 17 Posts
goodlord that house aint going no where! looks good though!


Originally Posted by SteveBricks
As far as government authorities, all of the building inspection in Mono County's thing. The process of actually getting approval for the project involved just about any agency you could name, from the Lahontan Regional Water Quality Control Board and the State Department Of Fish And Game to the Army Corps Of Engineers.
the shear amount of government in construction any more is mind boggling. the walmart remodel im working on the corporate polices year after year get more interesting. (sissor lifts have to park on plastic in a containment area when charging, hazmat sea container lined with plastic to the ceiling for old light bulbs and paint, etc... waiting for them to require us to store our water based wire lube in there, storm water training and containment, etc etc)
 