Does anyone know what kind of pipeline they are putting in up there? It looks like quite the project.
 
  #2  
Old 07-24-2008, 11:43 AM
seventyseven250's Avatar
seventyseven250
seventyseven250 is offline
Lead Driver
Join Date: Jun 2005
Location: Calgary Canada
Posts: 8,058
Received 434 Likes on 319 Posts
No idea. What size is it? I would assume the major east to west natural gas transmission lines would run further north to avoid the parks, but that's a guess at best.
 
  #3  
Old 07-24-2008, 11:54 AM
preppypyro's Avatar
preppypyro
preppypyro is offline
FTE Legend
Thread Starter
Join Date: Aug 2004
Location: North Central Rural Sask.
Posts: 37,859
Received 12 Likes on 12 Posts
Its gotta be maybe a 24inch ish pipe.
 
  #4  
Old 07-24-2008, 02:26 PM
seventyseven250's Avatar
seventyseven250
seventyseven250 is offline
Lead Driver
Join Date: Jun 2005
Location: Calgary Canada
Posts: 8,058
Received 434 Likes on 319 Posts
Well if it's 24" pipe, that'll flow some serious gas. The Hinton/Edson/Jasper area are no longer my problem, so I haven't been keeping up with it.

Two possibilities. 1) bringing gas from NEBC to fill the half used gas plants in Central Alberta, or 2) shipping processed gas out to Kitimat for the LNG terminal that was proposed. I know there were projects of both types on the drawing boards a year or two ago, but I never heard that they were going ahead. I would have thought either project would go further north though, closer to tumbler ridge.
 
  #5  
Old 07-24-2008, 03:53 PM
brmpipes's Avatar
brmpipes
brmpipes is offline
Elder User
Join Date: Sep 2006
Posts: 503
Likes: 0
Received 0 Likes on 0 Posts
iI\I searched Jasper pipeline project and got the twinning of an existing pipeline going toward bc.North American pipeline is doing the work i believe.The original owners had a deal with the government ,that in 1955 they would be able to upgrade the pipeline but only once in the park region.aperrently this is being done now.
 
  #6  
Old 07-24-2008, 06:28 PM
preppypyro's Avatar
preppypyro
preppypyro is offline
FTE Legend
Thread Starter
Join Date: Aug 2004
Location: North Central Rural Sask.
Posts: 37,859
Received 12 Likes on 12 Posts
That would be the one brmpipes, North american was doing the work, thanks, reps your way.
 
  #7  
Old 07-24-2008, 08:23 PM
Zip's Avatar
Zip
Zip is offline
FTE Legend
Join Date: Jan 2006
Location: Princeton, BC
Posts: 37,273
Received 166 Likes on 105 Posts
We drove through there a few months ago. That is going to be one long pipe line. I was quite surprised to see it along the highway through the park.

On our way back we actually got stopped leaving Jasper while they moved equipment across the street. The layed old tires across the street for the tracked equipment to drive on. Took about 10 min to get everything across.
 
  #8  
Old 07-24-2008, 08:47 PM
brmpipes's Avatar
brmpipes
brmpipes is offline
Elder User
Join Date: Sep 2006
Posts: 503
Likes: 0
Received 0 Likes on 0 Posts
After Edmonton-based contractor North American Construction Group finishes laying jumbo pipe, 36 inches (91 centimetres) in diameter, across 159 kilometres of Jasper National Park and British Columbia's Mount Robson Park next November, oil deliveries will rise 15 per cent to 300,000 barrels per day.

The increase will only begin to use the route's newly built-in capacity to keep on expanding without further construction in the most environmentally touchy legs of the 1,150-kilometre corridor from Edmonton across the Continental Divide to Vancouver.
 
  #9  
Old 07-28-2008, 11:59 PM
mustange70's Avatar
mustange70
mustange70 is offline
Post Fiend
Join Date: Nov 2001
Location: Coutts Canada
Posts: 5,871
Likes: 0
Received 0 Likes on 0 Posts
diddo on the big inch pipe, i was doing the welder qualifications at my old job before i left for that pipeline.
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
arctic y block
Small Block V8 (221, 260, 289, 5.0/302, 5.8/351W)
76
12-05-2013 11:41 PM
nationm
2004 - 2008 F150
3
05-22-2013 02:47 PM
Wyo 1Ford_
1973 - 1979 F-100 & Larger F-Series Trucks
8
11-20-2002 08:46 PM
76supercab
1973 - 1979 F-100 & Larger F-Series Trucks
1
06-04-2002 08:01 PM
RadarRick
Performance & General Engine Building
5
08-22-2001 11:04 PM


Thread Tools
Search this Thread
Quick Reply: Jasper Area



All times are GMT -5. The time now is 10:22 AM.