May 2008 B/S volume 8
#31
Bud I take Cold spring lane to perring Parkway to 695 to exit 39 merritt blvd. Then to home. Bud if you follow the beltway you will notice that there is no exit 37 as well.
#32
Dave I have been there 5 times. Gets old after the second trip you end up looking for mini golf which I did find within walking distance of the falls. Also found a wax musuem as well.
#34
Dave that is the canadian side. When I was there it was for a reenactment for the siege of Fort Erie. The site that is at is about 30 mionutes away from the falls on the canadian side. When we are at the fort we are across the mouth of the Niagara River from Buffalo. Also got to see the guinness book of world records musuem as well.
#35
Dave that is the canadian side. When I was there it was for a reenactment for the siege of Fort Erie. The site that is at is about 30 mionutes away from the falls on the canadian side. When we are at the fort we are across the mouth of the Niagara River from Buffalo. Also got to see the guinness book of world records musuem as well.
#36
Right...and the bottleneck is at the 95/495 interchange. Esp if there's a lot of truck traffic....Can't you go south on 95 and get off and go across NorthPoint?
#38
Bud they have the ramp to southbound 95 shutdown as well. They detour you onto 95 north to 43 west to 95 south and then back onto the Beltway. Bud next time your on the beltway in my area look for exit 37.
#41
That it is Dave. I usually just get off at route 1 Belair rd north to rossville blvd to route 7 philadelphia rd to the beltway and get back on. I miss all the construction detours that way.
#44
Nite Bud.
Won't it be great when ever they get our wonderful roads
done although they never will.
They'll get all the sound proofing done and find something better.
Then they'll get all the lanes done all the way around then realize
they need another one.
I'm out of here too Shuan,
Nice chatting with you again
and have a good night
Won't it be great when ever they get our wonderful roads
done although they never will.
They'll get all the sound proofing done and find something better.
Then they'll get all the lanes done all the way around then realize
they need another one.
I'm out of here too Shuan,
Nice chatting with you again
and have a good night