Your Majesty..........
#1
#2
Lets see what else I need.
(4) 8-foot green metal roofing at 3-ft wide and 2 matching gable flashing.
(1) or (2) Burito Supreme. Better make it (4)
Some DARN SNOW......
PS They are still working on the road from the flood but they now are only doing 8-5 through the Canyon so no more 1/2 to 1 hour waits.
(4) 8-foot green metal roofing at 3-ft wide and 2 matching gable flashing.
(1) or (2) Burito Supreme. Better make it (4)
Some DARN SNOW......
PS They are still working on the road from the flood but they now are only doing 8-5 through the Canyon so no more 1/2 to 1 hour waits.
Last edited by mlb4966; 11-23-2006 at 02:31 PM.
Thread
Thread Starter
Forum
Replies
Last Post