Today is the day........
Rodney, all your hard work on the RV inspired me to do some stuff on mine. I repacked the bearings, and added a capacitor to the A/C yesterday. I didn't get to finish stripping the old caulk or install new yet in one more strip along the bottom of the gutter, so that is still waiting on me. I also just ordered new hub caps, and a new tub/shower faucet fixture to install on my next days "off". Otherwise, I'm ready for Mammoth.
Join Date: Sep 2011
Location: Great Falls, Montana
Posts: 62,083
Received 3,940 Likes
on
1,577 Posts
Rodney, all your hard work on the RV inspired me to do some stuff on mine. I repacked the bearings, and added a capacitor to the A/C yesterday. I didn't get to finish stripping the old caulk or install new yet in one more strip along the bottom of the gutter, so that is still waiting on me. I also just ordered new hub caps, and a new tub/shower faucet fixture to install on my next days "off". Otherwise, I'm ready for Mammoth.
Join Date: Sep 2011
Location: Great Falls, Montana
Posts: 62,083
Received 3,940 Likes
on
1,577 Posts
Well, got some good rainy day news. New Jeep is off the train and has been picked up by the truck to go to the dealer. Should see it in a few days. Have a stack of accessories ready to go! It's been a while since I did any modifying and I'm feeling withdrawal...
Got a new grease cap coming from MorRyde and a backup from etrailer. Got some replacement tstat covers coming from Dometic thanks to Dave's research. Got a new magnet coming from ProLine for one bad brake on the enclosed trailer. Lots of progress in the mail. Now to implement it along with the Jeep upfitting! Then it's on to the land. Got the surveyors lined up to mark boundaries and do the plot plan. Then septic design and tree/lot clearing. Perhaps some well drilling this year too...
Got a new grease cap coming from MorRyde and a backup from etrailer. Got some replacement tstat covers coming from Dometic thanks to Dave's research. Got a new magnet coming from ProLine for one bad brake on the enclosed trailer. Lots of progress in the mail. Now to implement it along with the Jeep upfitting! Then it's on to the land. Got the surveyors lined up to mark boundaries and do the plot plan. Then septic design and tree/lot clearing. Perhaps some well drilling this year too...