My New Shop ( another work in progress...)
#62
#63
#66
This story will have to wait for a GTG.............lol
Success today! Had a great day today. Finished up two of the three sides of the fence. Just have to add the barbed wire to the top of the fence, and got the roof covered with tarps till we get better weather to install the new roof.
Pics:
Now I have to move my container..............
Success today! Had a great day today. Finished up two of the three sides of the fence. Just have to add the barbed wire to the top of the fence, and got the roof covered with tarps till we get better weather to install the new roof.
Pics:
Now I have to move my container..............
#67
#70
Well we got the parts room almost finished this week. The room is painted up to the 8' mark, still have to finish the last 4' but it's above the shelving and can be finished later. Still have to put up some of the shelf boards, but the new plywood is there and ready to be cut. We spent the last 3 days moving about 40,000 lbs of parts from my container. The container is enpty now and ready to be moved next week, I hope.........
View into the parts room from the main shop through the new Dutch door.
Right side of the parts room.
Left side of the parts room.
View into the parts room from the main shop through the new Dutch door.
Right side of the parts room.
Left side of the parts room.
#74
Yep, they can not restrict the carry of a concealed firearm. However, should it be open carried or in your rig and not concealed that can lead to problems.