I have finally gotten to the point of seeing the light at the end of the tunnel with the unexpected 'remodel' of the master bedroom in my house. Over the last few weeks, the wife and I have been busy sanding the log walls down and sealing them with 3 coats of water based polyurethane, put 2 coats of oil based poly on the ceiling, repainted the other two walls, installed about 300 sq. ft. of solid hardwood flooring with the help of 2 brother in-laws in an afternoon, then sealed the floor with a sanding sealer and 3 coats of water based poly. Poly'd and re installed most of the baseboard trim and moved all of the furniture back in over last weekend. Still have a few doors to finish up with and then I am done. On Monday drove one of the fire trucks in two parades and attended a service after one of them.