the 94 250 restore project
well the old diesel is tagged and insured need a inspection sticker now. still gets the knock in it from time to time. but after
rad. support
new fenders.
a crap load of body work
welded in patch panels.
new clutch assy, luk
removed both tanks and new front tank installed,
re wired the rear of the truck,
clean clean frame. still needs to be replaced.
new spring hangers and frame brackets,
new shackles.
and there is a lot of more work needs to be done.
like new exhaust,
new rear tank
4x4 shifter
maybe new brake system replaced,
maybe new fuel lines,
new injectors,
new passenger door or fixed.
and paint,
maybe front end work.
tires
shocks(rotted in too)
and god knows what else.
Last edited by ncfirefighter46; 12-31-2006 at 10:54 PM.