Some Good Progress On the Big Job
#1
Some Good Progress On the Big Job
Got some much needed progress done on the Big Job since the GTG. Relocated it to the driveway (much easier to work on it on the pavement than the grass). Put Dons "Mud Rug" to use. Makes the pavement a little more comfy. Managed to get the air lines all ran. New brass fittings. Got a return line installed into the gas tank. Started hooking up wiring. If the weather keeps staying strong, and they don't find something wrong with my arm, I should be able to drive the beast before too long. Put some pictures in my gallery, and here are a few.
Bulkhead fitting used to make the return line port.
The wind caught the flag at just the right time for this picture.
Bulkhead fitting used to make the return line port.
The wind caught the flag at just the right time for this picture.
Thread
Thread Starter
Forum
Replies
Last Post
wmjoe1953
1948 - 1956 F1, F100 & Larger F-Series Trucks
20
02-22-2013 08:42 AM
wmjoe1953
1948 - 1956 F1, F100 & Larger F-Series Trucks
17
08-05-2011 06:35 PM
wmjoe1953
1948 - 1956 F1, F100 & Larger F-Series Trucks
18
07-23-2011 07:17 AM