
02-17-2004, 11:30 PM
|
 |
Moderator
|
|
Join Date: Nov 2003
Location: Nutter Fort, WV
Posts: 13,624
|
|
|
I can tell you this.
According to the book price to remove and replace the heads in frame the hours are about 30 hours, mostly because of how hard it is to get to everything.
Remove and replace engine is 14 hours.
Depending on your local repair rates you can figure from there.
If I were doing the job, I would pull the engine to do it and probably come away with a better job for less money than doing it in frame.
I base that opinion on how tight it is in my 86 engine compartment to work on it.
|
__________________
86 F250 HD 6.9 IDI ATS turbo "not exactly" stock 4x4 T19 BW1345 3.55LS both ends D60 front, 10.25" Sterling rear, ram air, dual stacks.
"I dig dirt"
FTE Guidelines
FTE Moderator IDI diesel forum
WV Chapter Member
|