Lead time on new truck?

Hi,


Say that you order a brand new truck that was not on anyone's lot, so it had to be built. Once the factory sends you a copy of the window sticker, about how long after that should the truck be available?
 
  #2  
Old 02-11-2016, 10:32 AM
chickfisher69's Avatar
chickfisher69
chickfisher69 is offline
Junior User
Join Date: Jan 2016
Posts: 70
Likes: 0
Received 0 Likes on 0 Posts
I ordered my f250 January 15th and it looks like I will have it Monday the 15th
 
  #3  
Old 02-11-2016, 11:12 AM
Just Strokin's Avatar
Just Strokin
Just Strokin is offline
Post Fiend
Join Date: Nov 2001
Location: Tallassee, ALabama
Posts: 6,748
Received 98 Likes on 84 Posts
A conservative estimate most dealers will give you is 6 weeks. Some has to do with how far you are away from KTP in Louisville, KY and the availability of rail cars going your way.
 
  #4  
Old 02-11-2016, 11:27 AM
SXIPro's Avatar
SXIPro
SXIPro is offline
Junior User
Thread Starter
Join Date: Oct 2015
Posts: 65
Likes: 0
Received 0 Likes on 0 Posts
Yowza. This truck was ordered in November and the window sticker was generated on 1/14/16. And still no truck.
 
  #5  
Old 02-11-2016, 11:37 AM
Frantz's Avatar
Frantz
Frantz is offline
Postmaster
Join Date: Jun 2014
Location: Lewisberry, Penn
Posts: 2,775
Received 7 Likes on 6 Posts
Ummm... 6 weeks is a pretty liberal estimate. Frankly the SD fleet is showing at 10-12 weeks last I looked. I tell folks "3 months, and it could be longer".

I hear "6 to 8 weeks" quite often, but that normally ends in customers ticked off that it took so much longer. I'd rather not oversell something like that.
 
  #6  
Old 02-11-2016, 12:04 PM
MadWolf's Avatar
MadWolf
MadWolf is offline
Tuned
Join Date: Oct 2014
Posts: 422
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by SXIPro
Hi,


Say that you order a brand new truck that was not on anyone's lot, so it had to be built. Once the factory sends you a copy of the window sticker, about how long after that should the truck be available?
Mine took about 8 weeks, I think. After the window sticker..hmm..I'm not sure. I think that showed up in the middle of the wait. But they said there was a shorter wait for 2wd. I might order another one soon too....


What config/options are you getting?
 
  #7  
Old 02-11-2016, 12:16 PM
chickfisher69's Avatar
chickfisher69
chickfisher69 is offline
Junior User
Join Date: Jan 2016
Posts: 70
Likes: 0
Received 0 Likes on 0 Posts
I was told 10 to 12 and mine somehow made it in four weeks F250 fx4 ultimate lariat loaded gas engine had a Vin number within two days and a build date. I'm in Virginia. Maybe mine replaced a dealer stock order unit that was upfront
 
  #8  
Old 02-11-2016, 12:26 PM
MetroX's Avatar
MetroX
MetroX is offline
Cross-Country
Join Date: Nov 2015
Location: Milford
Posts: 55
Received 12 Likes on 7 Posts
I ordered my F350 XLT on Nov 9, delivered to dealer on Dec 22. Once you have that window sticker, you will have a scheduled build date. If your dealer won't tell you the date, ask Crystal on the 2016 PSD Orders forum here and she will get you the info.

https://www.ford-trucks.com/forums/1...info-here.html
 
  #9  
Old 02-11-2016, 12:27 PM
KCBS Smoker's Avatar
KCBS Smoker
KCBS Smoker is offline
Senior User
Join Date: Jan 2014
Location: Sterling
Posts: 237
Likes: 0
Received 2 Likes on 2 Posts
6 weeks for mine to be delivered after the order was placed. Probably about 4 weeks after the sticker was generated.
 
  #10  
Old 02-11-2016, 12:50 PM
PIGGEONFLIER's Avatar
PIGGEONFLIER
PIGGEONFLIER is offline
Freshman User
Join Date: Jul 2015
Location: Lancaster, Ohio
Posts: 49
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by MadWolf
Mine took about 8 weeks, I think. After the window sticker..hmm..I'm not sure. I think that showed up in the middle of the wait. But they said there was a shorter wait for 2wd. I might order another one soon too....


What config/options are you getting?
Mine took 11 weeks and I never did get a window sticker. Mine is a 2 wheel drive, standard cab, a dinasour by today's orders, everyone wants 4WD with more than 2 doors.
 
  #11  
Old 02-11-2016, 01:26 PM
sneil's Avatar
sneil
sneil is offline
Mountain Pass
Join Date: Jan 2016
Location: Colorado
Posts: 158
Received 34 Likes on 23 Posts
I ordered mine on October 4th, dealer got me the VIN on October 23rd, delivered on December 5th. The build date was November 18th. I think I was able to access the window sticker online after the build date. Took just about two months which is what the dealer estimated. I ordered a F350 CCSB PSD 4x4 Platinum.
 
  #12  
Old 02-11-2016, 02:08 PM
dalebunker's Avatar
dalebunker
dalebunker is offline
Freshman User
Join Date: May 2009
Location: Stockton, CA
Posts: 34
Likes: 0
Received 0 Likes on 0 Posts
My order

I'm in the California Central Valley

Dec 29th, Order Placed
Jan 15th, Build date assigned for Feb 8th.
Feb 8th, in production
Target delivery Feb 27th.

Looking to be right at 8 weeks. We'll see what happens:-)
 
  #13  
Old 02-12-2016, 09:32 AM
FordService's Avatar
FordService
FordService is offline
Official Ford Rep
Join Date: Oct 2010
Posts: 3,123
Likes: 0
Received 5 Likes on 5 Posts
Originally Posted by SXIPro
Hi,


Say that you order a brand new truck that was not on anyone's lot, so it had to be built. Once the factory sends you a copy of the window sticker, about how long after that should the truck be available?
Congrats on ordering, SXIPro! Send a PM my way with your VIN; I'll provide you with an update on your truck's ETA.

Crystal
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
paulstravels
2017+ Super Duty
44
10-26-2021 07:17 AM
Fr8dog69
2017+ Super Duty
18
08-24-2017 12:09 PM
41hat
2017+ Super Duty
6
08-09-2017 05:06 AM
jsa3107
6.7L Power Stroke Diesel
9
08-22-2012 04:19 PM
flatbeder
1999 - 2003 7.3L Power Stroke Diesel
10
07-26-2010 04:06 PM



Quick Reply: Lead time on new truck?



All times are GMT -5. The time now is 02:29 PM.