Dually Econoline 4X4
#17
#18
#19
Join Date: Mar 2005
Location: Marlboro Mental Hospital.
Posts: 60,981
Received 3,103 Likes
on
2,165 Posts
#20
#21
#22
August 2013 is the last month for E-series production at Ohio Assembly, then they retool to make the F650/750.
Walton Hills Stamping, which makes panels for the E-series is currently set to close when E-series production ends.
As for the new full size Transit, its made in Kansas City in the same facility where the Escape used to be built. Escapes are now built in Louisville.
Walton Hills Stamping, which makes panels for the E-series is currently set to close when E-series production ends.
As for the new full size Transit, its made in Kansas City in the same facility where the Escape used to be built. Escapes are now built in Louisville.
Thread
Thread Starter
Forum
Replies
Last Post